Subtitles section Play video Print subtitles stage two lakhs. Load started DVC Hydraulics. That pressure stage one field. Close up tanks. That pressure for sure. My creature final are prone. Bleed started. Stage two TVs. Emotions are complete. I have a letter for just started. Stage one lakh slow. This goes up stage two lakhs. Lotus goes out vulcanized and started. Stage two is pressing for flight. It's a long trip around. Countdown one. We're go for launch. Gaskell, close outs are complete. Stage one, pressing for flight T minus 15 seconds and nine, 87 six, five, four, three, two, one. Lift off of the Falcon. Nine vehicles pitching down. Range stays on. Propulsion is nominal. Power and telemetry. Nominal vehicles. Supersonic vehicles reached. Maximum aerodynamic pressure and back chills. Begin. Heart Heart Acquisition of signal. Well, you may go. State separation confirmed on back. Ignition bearing separation Confirmed. Stage two. Trajectory nominal. They do in Ft. Sssh. Stage one. Landing burn. Stage one. Landing shut down. Falcon nine has landed.
B2 stage nominal pressure falcon separation pressing Spaceflight SSO-A: SmallSat Express 2 0 林宜悉 posted on 2020/03/28 More Share Save Report Video vocabulary