Subtitles section Play video Print subtitles Let us know what can you introduce to us, yeah? Yeah, sure, I just joined a media assistant Monday. Yeah, work for James Lee and yeah, basically I I I have background in reliability, availability and serviceability and so basically James wants me to focus on the MPI. And just say I AS perspective. So yeah, this is a little bit of my background. Yeah, I have been in the liability and availability serviceability field for over 20 years. I have had a work for IBM and Mac electronics for chip and packaging level reliability and Apple for consumer products. And before I join a media, I I work for a cruise for autonomous vehicle. I asked so excited and join the team and hope I can bring contributions and values to media. Great. Welcome to the team. Yes, thank you. Thank you. I look forward to working with everyone. OK, great. Alright, let me get on to it. Hopefully we can make it short today. I need to run shortly, so let's see. OK, so for number one. You can ask for a QS rack. We don't have one, so we won't be getting a QS rack, but we working on the TS3. Approver is getting the DAGs ready, so once that rack is ready, we might give that to Ingress for the DAG development to verify our DAGs. OK. OK, so. Oh. Do we have any schedule? Yeah, I think last week. You're trying to at least. I know. We keep on having issues with the DAGs to have a clean run, so that's the problem, right? So even today, Approver still working on the rack, so they still like switching, swapping compute trays and other stuff. So we haven't got the DAG full clean run yet, so that's the problem. So that's why we can we can get the DAG released. Once you get it released, then we'll provide you the rack. OK, thank you. Yep. So you need that for your DCC as well, right? So that's why you want the rack. Yes, OK. OK, yeah, well, we'll do our best to get it once we can release the DAG. OK, thank you. OK, number two PDB. Time's not here. So what was the question on the PDB? So you want to program? Beta feed to match information into them. So basically, you need to program the PDB to the new version. I think I'll just clarify a bit. For now, we have ingressed this part distributed for libraries will be writing the fruit parts into the board because it is actually empty, so we have to write a theme file to the fruit. But based on my understanding in FLA station, you actually rewrite the rewrite the field to the board, right? That means that all the all the information will be covered to what NVIDIA provide. This is good for NVIDIA generated, but not good for ingresses because ingresses actually have different part number and other version, so we just want to make sure that if this is the expected behavior or should we? And should we provide more information to the data file so that your FLA station will get those files to write your fruit data into the part distributed board? That's a question for Eric. Eric, do you know? What would you need? You mean me? Yes. I'm happy to work with whatever makes sense for folks, but I don't know offhand if we have anything that's pre written that we more convenient. So maybe give me half an hour to run it down and I'll send it via email or other media. OK. Is that OK? Yeah, OK. I think this problem we have discussed with Hong and I think you can check with him. Yeah, so can you close with him? OK. Alright, so what is number three? OK, yeah, so this is the. The management switch you have a different reading, so we haven't got an update. So Peter Nguyen is going to follow up on that one. So no update on that one for now. And then. For number four, so Peter as well as send an email. So regarding the data file. So we want the data file to include all the MAC addresses for all the devices that has MAC addresses, like for example, the power. What is it? The power shelves and then. What's on the device? Forgot. Yes, I guess. Yes, so we would like to include whatever the devices MAC addresses to include in the data file as well. OK, I'll reveal it. OK, thank you. Yeah. So yeah, so this is I think some other teams they want the MAC addresses in there as well so they can sort of prepare the system. And just one final question, when do we would like to get it? If you ask me as soon as possible, but it's up to you guys whenever you guys are ready. OK, I'll try my best. Yeah, alright, thank you. OK, and then the other item. Number five, I put it was talked to Ken last time to basically update the hyper testing SOP. To include the because you guys tested each power shelf individually, but in the SOP doesn't specify that very clearly. So yes, I just want to highlight to update the SOP to include that. OK. OK. Alright. And the other item is the assembly times. I think we asked this question before. So basically we went through the exercise of how long we measure each time like it takes to assemble each step. But I don't know where is that information located. So if you guys have that information, that'd be great. We're trying to find out how long it takes to assemble, for example, the 11 rack and each of the steps. I will forward this question to our MPM. OK, great. And the last one is the pretest times by test. So if I share this one. So basically we sort of have an idea how long it takes for each of the pretest as a whole, but we want to sort of like break it up how long that takes for each of the individual tests. Just to have an idea of how long would it take to do the entire pretest. So if you can give me that info. OK, wait. OK, we will check our test log. And yeah, yeah, yeah. OK. Thank you. I think that's all I had. All right. Anybody else has any other questions? No. All right. Thank you guys. I think that's all I had. All right. Thank you.
A2 US rack mac file update include data 20241101 GB NVL MFG Technical VEED 6 0 葉宗德 posted on 2024/11/08 More Share Save Report Video vocabulary